Reference Name of the project Main activity Country Year
497 Capacity building for the WAPP's utilities in distribution network planning optimization and GIS uses in the energy sector. Capacity building WESTERN AFRICA. . 2023-2024
496 Carrying out studies and supervision associated with the densification and operation of the N'Djamena Distribution Network, within the PIRECT framework Technical assistance Chad 2022-2027
495 Technical assistance for the operation and maintenance of the Mbakaou Carrière small hydroelectric powerplant (1.5MW) Technical assistance Cameroon. . 2022-ongoing
494 Update of the Kenya National Electrification Strategy (KNES) Studies Kenya. . 2023-2024
493 Preliminary detailed design studies and tender documents for the ProMER project (Project for the Modernization and Extension of the Electrical Networks of the SBEE) Studies Benin. . 2023-2024
492 Design studies of HV power lines in 30kV between the cities of Mbui and Makond and between Pouma and Messondo Studies Cameroon. . 2022
491 Design studies of 30kV MV power lines between the cities of Ngaoundere and Meiganga Studies Cameroon. . 2021
490 Design studies of the MV power line in 30kV between the cities of Foumban and Mayo Darlé Studies Cameroon. . 2021-2022
489 Diesel power plants solar hybridization study and extensions of medium land low voltage networks for 23 isolated localities in Niger Studies Niger. . 2023
488 Feasibility study for a photovoltaic power plant with battery energy storage in N'Djamena Studies Chad. . 2022-2023
487 Modelling Mauritania's energy trajectory by 2050 Studies Mauritania. . 2023
486 Technical assistance for electricity sector institutions capacity building for the management of the Universal Access Program in Senegal Technical assistance Senegal. 2022-2025
485 Kenya Green Mini Grid programme Impact study Studies Kenya. . 2022-2024
484 Additional study on the electrification of the city of Kabinda Studies DRC. . 2022
483 Implementation of the electricity distribution infrastructures geographical information system and of the CEET's customers Software application Togo. . 2022-2023
482 Integration of solar and wind power plants of up to 100 MW into the N'Djamena power grid Studies Chad 2022
481 Development of the WAPP GIS database and its web-based visualization interface Software application WESTERN AFRICA. . 2021-2023
480 Control and supervision of the works to add a 63/15 kV transformer span to the Sémé substation and HV connection of the FABRIMETAL plant Multiple Benin. . 2022
479 Assessment of Electrification Options for Sierra Leone Studies Sierra Leone. . 2022-2023
478 Technical assistance for the identification and formulation of an energy action ENR Technical assistance Cameroon. . 2022-2023