Studies
Hydro electricity. Information systems N/A
Feasibility study for mini hydropower stations implementation on Ceze river
Country : | France . |
Client : | Syndicat intercommunal d'électrification de la Région de Pont-Saint-Esprit |
Start Date : | 2006 |
Completion Date : | 2006 |
Value of services : | N/A |
Funder : | Région Languedoc-Roussillon - Conseil Général du Gard |
Associate/Partner : | CESAME |
--------------------------------------------------------------------------------------------------------------------------------- | |
Description : |
The objective of the specifications was to study, on the Cèze river, between the communes of Montclus and Saint-Gervais (30) the conditions of development of hydro-power stations equipped with turbines/wheel-stopping able to produce with a gravitational energetic efficiency of electricity starting from low falls (1 to 5 meters) |
--------------------------------------------------------------------------------------------------------------------------------- | |
Description of the Actual Services Provided | The project contains two main phases : 1- a feasibility study of the Cèze valley (approximately 20 km) which is to operate through an multicriterion analysis relating to the various following fields: Hydrology, land and right water, regulation framework, environmental stakes, technical and economical feasibility, local network analysis, assessment and estimated request (if isolated sites) IED/CESAME established on the basis of this matrix, a typology of the various sites by homogeneous groups by proposing a method of notation validated by the Steering committee. This work allowing to make emerge two sites-pilote. 2- a summary preliminary draft for two sites-pilot. The Syndicat Intercommunal d’électrification de Pont-Saint-Esprit (30130 CARSAN) is the contracting authority of the study. It is assisted in its task by cabinet CEREG (30900 NIMES) The designer of the turbine/wheel-stopping and operator H3E are partners in the development suggested. |