Studies
Power distribution. Power generation  N/A

barre-colore

 

Study mission for the revision of the tender documentation for Bissau city electric system reconstruction work

Country : Guinea Bissau
Client : European Commission. Bissau Delegation
Start Date : Mai 2012
Completion Date : Octobre 2012
Value of services : 74 610 €
Funder : European Union
Associate/Partner : N/A
   ---------------------------------------------------------------------------------------------------------------------------------
Description :
The project aim is the revision of the tender documentation for materials and work for Bissau reconstruction:
* Building of a 30 km loop of MV network 30 kV (double earth option)
* rehabilitation of existing power plant (1/6,6/0,4 kV) with adding of new 30kV transformer and reworking of control system
* Building of two MV/MV 30/10 kV substation
* Rehabilitation of 80km of MV network of Bissau city, deleting of 6,6kV network
* Rehabilitation of 102 MV/LV transformers
* Building of 10 new substation MV/LV (H59 and H61)
* Building of 140 km of new LV network
* In option, rehabilitation of public lighting and burying of LV network in the city centre.
   ---------------------------------------------------------------------------------------------------------------------------------
Description of the Actual Services Provided Based on the technical study, the detailed feasibility study and the Call of Tender for work, IED has prepared, in collaboration with the Ministry of Energy and the public utility, a new version of the Call of Tender. The new version included actualised and more precise technical specification (based on on-field studies), tender plans of better quality and complete environmental and social chapters.
The main modification were:
* Exact localization of outdoor substations, updating of topographic data on the 30kV loop, differentiation of MV distribution network 6,6 and 10 kV, drawing of LV network plan.
* Drawing of plan showing current situation, MV network, implantation of distribution, electric, and protection panel of the central substation.
* Documentation of environmental and social section
* Amelioration of administrative part of the Call of Tender regarding EDF contract procedure.
* Elaboration of the estimated price list of material.