Technical assistance
Hydro electricity. N/A  N/A

barre-colore

 

Technical Assistance on the feasibility study of the Fanovana site hydroelectric development (17 MW)

Country : Madagascar
Client : Ministry of Energy and Hydrocarbons (MEH) .
Start Date : 2020-02-28
Completion Date : 2021-10
Value of services : 194 004 EUROS
Funder : World Bank .
Associate/Partner : LNTPB (for Geology Geotechnical) - ILS (for Topographic assistance)
   ---------------------------------------------------------------------------------------------------------------------------------
Description :
The Fanovana site is a run-of-river hydroelectric development, with no possibility of modulation, with an installed capacity of around 17 MW (2 turbines) for a productive average annual of 71 GWh.

The Consultant's mission has two main objectives:
(i) Carry out the feasibility study of the Fanovana hydroelectric development project,
(ii) Strengthen the capacities of the Client's staff by transferring skills to the
preparation and all technical aspects of the project.
   ---------------------------------------------------------------------------------------------------------------------------------
Description of the Actual Services Provided - Implementation of the feasibility study
- Field missions
- Topography, bathymetry, geology, geophysics, geotechnical
- Hydrology
- Technical design of the layout
- Energy connection and disposal study
- Economic and financial analysis
- Partnership Public-Private (PPP)
- Training